BLUE MOUNTAINS TRIP WEDNESDAY 25TH
MARCH
BRIEF
IDEAS
|
- Possible concept
= explore reverse engineering
- Possible concept
= Interpreting and publicising the environment
- Look into tower
structure = explore construction and deconstruction
|
CLIENT NEEDS/WANTS
|
- Previous
simulation educated people about how the ropeway fell apart
- PROBLEM: old
simulation wouldn’t run live off the web, but ran once downloaded
- Extension on
what was already done, but with the bugs removed
- Used as an
interpretation piece to be used in their web
- Next step = make it interactive
- Address how to
make the interactive/interpretive accessible too = how to get the
software/technology
- Novelty factor
and creative use of the technology
- What can be done
with the final product?
- Community is
very interested in photographs and what happened
- To educate
people who know nothing about the ropeway
|
HISTORY
|
- Remains = tension pits
- Tension pit at
the bottom of the valley, still and unknown
- Suspended bolt,
developed app and register national heritage
- The cable way is
just one part of what is down there, in the bottom of the valley lies a big
history of coal and shale mining in AUS
- Before the
ropeway failed, they had a lot of issues with it. They were trying to it and had previously
replaced part of the ropeway with solid bar wire - whilst clamping
- it together the wires it gave way
- Still to this
day it is unsure how the buckets derailed
|
OTHER
|
- Grant received
to promote community awareness
- ARC grant
project = in cooperates many universities
- Grant allowed
for gps linking
- Previous years
works was shown at a community event in February which generated excitement
within the community
- App based
software FAME has generated to exhibit what is down there = user friendly iPad
version
- Currently
developing an app to exhibit what the area was like 100years ago
- SHAWN ROSS =
FAMES
- Most of the
ropeway sits on national parks land and scenic world land
- ‘Blikett’ movie
– international web
- POV in the
bucket
- Haulage rope has
a little thing called a spider and a cone
- Brackets were
added afterwards to stop the rope moving up and down and lifting off
- If only one rope
did the carrying and moving then there would be a lot of issues, hence the
two rope system
- Difference with
the old and new ropeways = the hall wheel was 18inches away, whereas the new
ones are right below
- As the rope
flattens over time, micro cracking occurs and the pinched parts - every time it bends the wire cracking
spreads
- At the time of
construction they weren’t aware of metal fatigue
- Heavier buckets
were used
- Currently analysing
how the buckets are deformed in order to determine how they fell off, e.g.
buckets hitting one another
- Buckets were
70-80cm apart
- Rort Iron
buckets made in Lypshirk Germany
- Quality control
was non-existent
- The buckets haven’t
rusted as they are comprised of so many components
- Moved at 2m per
second
- Peter has been
working in the area for over 40years
- Forks were used
to stop the buckets tipping
- 800kg of shale
per bucket
- Shale is
compressed algae
- The area was
once under water/rainforest
- Rope structure
determines the amount of strands 13, 12, 6, 1
|